+44 (0) 1460 234 582
enquiries@blackdown.co.uk

Redcliff Quarter, Bristol, Phase 2 Blocks A&B

Redcliff Quarter, Bristol, Phase 2 Blocks A&B

Blue roof and intensive hard and soft landscaping to residents private podiums.

In conjunction with Alumasc Roofing’s BluRoof system, Blackdown were able to install the BluRoof water attenuation crate system and landscaping to the podium areas.

Coloured textured paving was incorporated with modular wooden planters together with trees and mature shrubs – reservoir irrigation systems were incorporated into the planters to allow manual irrigation during the growing season.

Leave a Reply

Your email address will not be published.